Defence Minister reviews delivery timelines of the 83 LCA Tejas Mk1A fighters with HAL and IAF leadership.
IAF Prepares to Induct First Tejas Mk1A Squadron as GE Begins F404 Engine Shipments
Via Press Information Bureau (MoD)
MoD Reviews Tejas Mk1A Delivery Schedule; First Squadron Operationalization Underway at Nal Air Base
Related Coverage
- GE Aerospace Dispatches First Batch of F404-IN20 Turbofan Engines to HAL Bengaluru (The Hindu)
- Inside IAF’s 83-Jet Tejas Mk1A Roadmap: Active Electronically Scanned Radar & EW Pods Integrated (Livefist Defence)
- HAL Ready to Scale Tejas Mk1A Production to 24 Aircraft Annually with Nashik Line Active (IDRW)